The scale of Poly Canyon Village is 820,000 square feet with 11,000 load-bearing wall panels. Originally planned for a twenty month schedule, the project was successfully completed in fourteen months, shaving off six months from the original schedule.
Embassy Suites: The contractor estimates that the cost savings of cold-formed steel compared to concrete is at least $10/SF. For Embassy Suites, this would equate to approximately $1,350,000 for the 135,000 square foot of floor area framed with CFS.
Park 4200: This 9 story mid-rise condo/parking structure used CFS structural members. The project costs $4.22/SF less that concrete that is a saving of over $400,000 for the 99,000 square foot building and completed 3 months sooner than using concrete, 16% off original construction schedule.