[HOME]
Steel Framing Alliance | Steel. The Better Builder

CASE STUDIES

The scale of Poly Canyon Village is 820,000 square feet with 11,000 load-bearing wall panels. Originally planned for a twenty month schedule, the project was successfully completed in fourteen months, shaving off six months from the original schedule.

Embassy Suites: The contractor estimates that the cost savings of cold-formed steel compared to concrete is at least $10/SF. For Embassy Suites, this would equate to approximately $1,350,000 for the 135,000 square foot of floor area framed with CFS.

Park 4200: This 9 story mid-rise condo/parking structure used CFS structural members. The project costs $4.22/SF less that concrete that is a saving of over $400,000 for the 99,000 square foot building and completed 3 months sooner than using concrete, 16% off original construction schedule.

 
 

CASE STUDIES

  • Piatt Place, Pittsburgh, PA
    Download PDF
  • Embassy Suites, Columbus, OH
    Download PDF
  • Park 4200 Condominium,  Dallas, TX
    Download PDF
  • Poly Canyon Village, San Luis Obispo. CA
    Download PDF
  • Cold-Formed Steel Wall Panels in a Production Setting: A Case Study of Navy Housing at Radford Terrace on Oahu, Hawaii.
    Download PDF
  • Insulated Cold-Formed Steel Wall Panels: A case study of a contractor-manufacturer
    Download PDF

CONTACT